How it works

Ten stages. You can see all of them.

Most kitchen projects go quiet somewhere between the showroom and the site. Here is every stage of ours, what happens in it, and what you'll be looking at.

The short version

  1. Requirement

    A short questionnaire about your home, your cooking and your budget.

  2. Design

    A layout and style direction that fits your room, not a template.

  3. Configure

    Choose modules, finishes, hardware and appliances, card by card.

  4. Price

    Every change re-prices instantly, down to the GST line.

  5. Order

    Approve, pay in milestones, and track production to handover.

01

Lead

Tell us your pin code and we confirm we can build there before anything else. Delhi/NCR today — Gurugram, South Delhi, Noida, Dwarka and Faridabad.

Requirement stage

02

Requirement

A guided questionnaire covers your room, your household, how you cook and your budget range. Stop halfway and pick it up later — nothing is lost.

Design stage

03

Design

We match your room shape to a layout — straight, L-shaped, U-shaped, parallel or island — and read your style from a quick swipe exercise.

04

Configuration

Modules, shutter finishes, hardware tiers, appliances, countertop and backsplash, chosen as plain option cards with real prices on them.

Pricing stage

05

Pricing

The total updates the moment you change anything, with GST split by category. If you drift over budget, we suggest trade-offs instead of a silent overrun.

06

Quotation

One itemised document: every module, finish, appliance and the installation line. Locked for 15 days from the day it's issued.

Approval stage

07

Approval

Share a read-only link with family, collect comments in one place, then e-sign. The advance is 25% of the approved total, not a negotiation.

08

Site verification

An engineer measures the real kitchen and assesses floor, lift and lane access. Any installation adjustment is shown with the reason — or ₹0 if there is none.

09

Production & installation

Production milestones and an install window you can plan around, with the crew named on your project page.

Digital Kitchen Passport stage

10

Digital Kitchen Passport

At handover you get a permanent record of exactly what was installed — every product, warranty date and care instruction, in one place forever.

Start at stage one. It takes about four minutes.

Check serviceability for your pin code, then begin the requirement questionnaire. You can stop and come back whenever you like.